Sunlight Homes: Custom Home Design
Nutshell: Introduction to Sunlight Homes Designing your Custom Home Building Your Custom Home Sunlight Homes Pricing Sustainable, Green Custom Homes
You Are In The Home Building Section!
structural insulated panels

BUILDING QUESTIONS + ANSWERS

structural insulating panels

BUILDING YOUR
CUSTOM HOME

OUR COMPONENT
PACKAGE

STRUCTURAL
INSULATED PANELS

BUYING LAND

CHOOSING
A BUILDER

OWNER
BUILDING

CONSTRUCTION
JOURNAL

BUILDING Q+A

BUILDER
INFORMATION

home floor plans

SUNLIGHT BLOG

ARTICLES

RESOURCES

BOOKSTORE

BROCHURE

LITTLE
SUNLIGHT HOMES

INNER SANCTUM

CONTACT INFO

SITE MAP

Contact Us!

• Q: HOW IS PLUMBING + ELECTRICAL DONE IN A PANEL HOME?

• A: wiring a SIP panel homeSunlight homes are designed so that most of the plumbing and a lot of the wiring is run in the interior frame walls and/or in the crawlspace under the floor in some designs.

Wiring is still needed in the exterior walls and there are usually a couple places where plumbing chases are necessary in exterior walls; the kitchen sink for example.

Most panel manufacturers build conduit into the panels and wiring is fished through the conduit once the structure is erected. We've found that electricians have some difficulty doing this and they often charge extra for the trouble.

In our homes we nail 2x2" furring strips vertically every 16" and leave a space at the bottom of each strip. (See photo) The wiring is attached directly to the inside OSB skin of the panel. Remodeling electrical boxes are used because they are shallow and don't cut into the panels. Once the wiring is run, the drywall is applied to the furring strips. This method simplifies the electrical work and remodeling and meets code.

• Q: HOW LONG DOES IT TAKE TO BUILD A SUNLIGHT HOME?

• A: Our custom design process usually takes 3 to 6 months from concept through working drawings. Design time can vary depending on the size and complexity of the home, our work load and our clients' availability. It is important to us that, once a design is begun, it continues at a reasonable pace until it is finished. This is important for design continuity.

In most situations, construction of a Sunlight home takes from 4-6 months depending on the size and complexity of the project, weather and availability of local labor. Panelized construction is often thought to be a fast way to build, but our experience has been that it doesn't really make much of an impact on the overall length of a project. Besides, the reason you build a panel home is for the comfort, strength and energy efficiency of the finished product; not the construction time.

• Q: MY REALTOR THOUGHT I WOULD HAVE A HARD TIME FINDING A DEVELOPMENT THAT WOULD ALLW ME TO BUILD A "MANUFACTURED STRUCTURE". IS THIS A COMMON THEME FROM POTENTIAL CLIENTS?

• A: Twenty years ago when we first started building SIP homes we ran into this and found the need to educate banks and architectural review boards about SIP homes. Once they understood our construction method, we were easily accepted. In fact, we have never been denied acceptance—even into areas with very strict covenants and restrictions.
These days people in the business seem to already know that a SIP home is on the opposite end of the spectrum from modular, mobile or manufactured homes. If you run into anyone who is needs info on SIPs, just send them to our web site or the site of our panel manufacturer at murus.com.

Follow the arrows to read our section written for builders.NEXT

 
alternative home building

TOP HOME NUTSHELL DESIGN BUILD PRICE GREEN

Email Sunlight Homes
Phone 505.856.5888 • Fax 505.856.5777

Web design by: Artimbo

Copyright 1995 - 2008 All rights reserved worldwide

custom home builder

green home building